Home
Contractors
For Contractors
Types of Metal Roofing
Product Gallery
Eavespan™ Soffit
Downloadable Catalog
Proof My Roof Visualizer
Color Selector
Training
Accessories
Components and Trim
Authorized Contractor Application
Warranties
Architects
Commercial Resources
Homeowners
For Homeowners
Types of Metal Roofing
Photo Gallery
Roof Visualizer
Color Selector
Metal vs Shingles
Roofer Locator
Warranties
Resources
“Roof Talk” Blog
Color Availability Matrix
Product Catalog
Brochures
Engineering Specs
Manuals
Product Approvals
Maintenance
Contact
Contact Us
About Us
Leadership
Why Gulf Coast
Request Samples
Sales Representative Locator
Account Advantage Customer Portal
Register Your Warranty
Credit Application
Return Policy
Careers
Search
1-888-393-0335
Se Habla Español
Get a Quote
The Trusted Name in Metal Roofing Since 1996
1-888-393-0335
Se Habla Español
Get a Quote
Home
/
Site Specific Request
Site Specific Design Request
CUSTOMER
Requestor:
(Required)
Project:
Project Address:
(Required)
Street Address
Address Line 2
City
Alabama
Alaska
American Samoa
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
District of Columbia
Florida
Georgia
Guam
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Northern Mariana Islands
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
U.S. Virgin Islands
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Armed Forces Americas
Armed Forces Europe
Armed Forces Pacific
State
ZIP Code
Submittal Date:
(Required)
MM slash DD slash YYYY
Building Department:
Permit # (if applicable). Put N/A if not applicable.
Special Submittal Requirements:
Unless otherwise noted, a scanned version of the signed/sealed report will be emailed to the requestor. If additional requirements exist, these must be specified (e.g. "overnight (1) paper copy of wet signed/sealed report to … ")Typical processing time is one week, pending availability of third party engineering services.
PANEL
Roof Panel and FPA or NOA #:
(Required)
If permit app has been submitted, the FPA or NOA # submitted MUST BE NOTED.
Fastener Pattern (horizontal fastener spacing):
If project has not been installed yet, "as required" is an appropriate entry.
Vertical Fastener Spacing:
If project has not been installed yet, "as required" is an appropriate entry.
Panel Width:
(Required)
Panel Material and Gauge/Thickness:
(Required)
Roof Deck Type & Thickness:
(Required)
Deck type + thickness must be noted. Specify purlin type+thickness+spacing for open framing.
Roof
Roof Slope:
(Required)
Eave Height (highest eave):
(Required)
Ridge Height (highest ridge):
(Required)
Predominant Roof Type (Hip/Gable/etc):
(Required)
Length of Building (being roofed):
(Required)
Width of Building (being roofed):
(Required)
Overhangs?
(Required)
Yes
No
Site
Wind Speed Zone:
Use this link to find wind speed:
https://hazards.atcouncil.org
Exposure Category:
Building Risk Category or Building Use:
(Required)
If the risk category is unknown, describe the current or proposed building use (e.g. "residential," "retail," "school," etc).
Enclosure Classification:
(Required)
Note if the structure is fully enclosed (walls on all sides from ground to roof).
Miscellaneous/Additional Notes:
Note any special conditions or unique requirements below. If drawings are available, please attach a copy. Unless otherwise requested, the specific design considers wind uplift performance only. If other issues need to be considered, note those below.
Signature
(Required)
By signing below, I certify that all of the information contained on this form is accurate, to the best of my knowledge. I understand that submission of a design request is no guarantee that the requested design is possible. Furthermore, I understand that the building department which has jurisdiction is the final authority on all code-compliance related issue. While uncommon, I understand that successful completion of this design request is no guarantee that the building department will concur.
Name of Person Signing:
(Required)
First
Last
Date Signed:
(Required)
MM slash DD slash YYYY
Δ
Back to top
Search for:
Search Button